AI Submission Assistant
Underwriting desk
A missing schedule, chased by link
oyyo noticed a missing schedule and drafted a request with an answer link.
Pine Ridge Builders Inc., a framing contractor (fictional)
Example on test data. The insured is made up.
Came in
A broker sent an application, contractor supplemental, and loss run, without the subcontractor schedule.
- Commercial application4 pp.
- Contractor supplemental5 pp.
- Loss run3 pp.
oyyo filled the submission and summarized the loss run. It drafted one broker request with a reply link.
Step by step
- Them The broker email arrives. The submission appears.
- oyyo Values are filled and cited to their pages. Loss run summarized: five years, two claims.
- oyyo Request drafted: four questions about subcontractors, answered on a link.
- You The underwriter reviews the draft request and presses Send.
- ThemLater The broker answers all four subcontractor questions on the reply link.
- oyyoLater Answers land in the submission, cited to the broker’s reply. No more asks are needed.
The values
| Field | Value | Source |
|---|---|---|
| Subcontracted cost | 18% of receipts | Broker, by link |
| Proof of insurance collected | Yes, all subs | Broker, by link |
| Claims, last 5 years | 2 | Loss run · p. 2 |
| Largest claim | $48,500 | Loss run · p. 2 |
What oyyo caught
The contractor supplemental required a subcontractor schedule. None was attached to the email.